Skip to main content
SummitDNC

Data Center Assessment

Data Center & Server Room Assessment

Your server room is the heart of your IT operations. We evaluate power distribution, cooling capacity, cable management, redundancy, and growth capacity — and deliver a professional report with optimization recommendations.

2–4 days on-site$3,500–$8,000

Comprehensive Evaluation

What We Assess

Our engineers evaluate every relevant system using professional tools and proven methodologies.

Power Distribution

We evaluate electrical capacity, PDU configuration, circuit loading, redundancy (A+B feeds), and UPS runtime under current load.

Cooling & Airflow

We measure hot aisle/cold aisle temperatures, assess CRAC/CRAH capacity, check blanking panels, and identify hot spots using thermal imaging.

Structured Cabling

We audit cable management, patch panel organization, fiber connectivity, labeling standards, and pathway fill ratios.

Rack & Space Planning

We assess rack utilization, weight loading, equipment placement, and growth capacity. We identify stranded capacity and optimization opportunities.

Physical Security & Access

We evaluate door locks, biometric access, camera coverage, visitor logging, and environmental monitoring (leak, smoke, humidity sensors).

Redundancy & Resilience

We review N+1 redundancy for power and cooling, failover paths, generator capacity, and disaster recovery readiness.

Simple Process

How It Works

01

Pre-Assessment Review

We review existing documentation, floor plans, and electrical one-lines before arriving on-site to maximize efficiency.

02

On-Site Assessment

Our team performs detailed inspection with thermal imaging, power metering, and structured documentation over 2-4 days.

03

Analysis & Report

We deliver a professional report with thermal images, power utilization charts, capacity projections, and optimization recommendations.

04

Executive Presentation

We present findings to your leadership with business impact analysis, risk priorities, and a phased improvement roadmap with ROI projections.

Your Report Includes

What You Receive

A detailed, actionable report — not a generic checklist.

Thermal imaging report with hot spot identification
Power utilization analysis by circuit and rack
Cooling capacity assessment with growth projections
Structured cabling audit with compliance findings
Rack elevation diagrams and space utilization
Physical security assessment findings
Environmental monitoring recommendations
Capacity planning report (power, cooling, space)
Phased optimization roadmap with ROI analysis
As-built documentation update

150+

Data Centers Assessed

30%

Avg. Cooling Savings Found

25%

Avg. Power Optimization

RCDD

Certified Engineers

Investment: $3,500–$8,000

Based on facility size and rack count

100% of the assessment fee is credited toward any project you engage us for within 90 days of the assessment.

Request a Data Center Assessment

Optimize your server room for efficiency, capacity, and resilience. Our assessment identifies savings and risk in power, cooling, and cabling.

Licensed & Insured (C-7, C-10)BICSI Certified15-Year WarrantyBBB Accredited
Get a Free Quote